New sanctions · Sept 30, 2026What changed, and how QvaPay keeps the lawful lanes open →
Permitted Fund FlowsSee the flows →
QvaPay SentinelTry Sentinel →
New on The WorldListen →
New Cuba
⚠ COMPLIANCENot legal, tax or investment advice, and not authorization for any transaction. U.S. sanctions (31 CFR Part 515) prohibit investment or equity in any Cuban business; nothing here is a determination that a transaction is lawful. Structure anything Cuba-facing only with qualified OFAC sanctions counsel and screen every party with QvaPay Sentinel.Primary sources: OFAC Cuba Sanctions · 31 CFR Part 515 (CACR) · OFAC Cuba FAQs · Cuba Restricted List
← Back to map
Energy & power plants · Artemisa

CTE Máximo Gómez (Mariel)

Thermoelectric power plant (oil-fired)

🔴 Stateℹ️ Atlas — info only
Scale
~400 MW nameplate (Soviet-era ~90 MW units; effective output far lower)
Status
Severely degraded 2025-2026. A 2022 fire knocked out Units 6-7 (~170 MW); Unit 6 returned then went offline again Sept 2025 on oil contamination and pump faults. Chronic outages. Opportunity: full retrofit/repowering.
Sector
Energy & power plants
Province
Artemisa
Coordinates
23.022, -82.750
Layer
Layer 2 · Atlas
Notes
Operated by Unión Eléctrica (UNE) under MINEM via the SEN national grid.
Controlling entity

National electric utility under the Ministry of Energy and Mines. Owns the thermoelectric fleet, the China-backed solar program and wind farms. State-owned and embargo-restricted, though not itself on the CRL/SDN.

Sources: Global Energy Monitor · CiberCuba · OpenInfraMap · Cubadebate