New sanctions · Sept 30, 2026What changed, and how QvaPay keeps the lawful lanes open →
Permitted Fund FlowsSee the flows →
QvaPay SentinelTry Sentinel →
New on The WorldListen →
New Cuba
⚠ COMPLIANCENot legal, tax or investment advice, and not authorization for any transaction. U.S. sanctions (31 CFR Part 515) prohibit investment or equity in any Cuban business; nothing here is a determination that a transaction is lawful. Structure anything Cuba-facing only with qualified OFAC sanctions counsel and screen every party with QvaPay Sentinel.Primary sources: OFAC Cuba Sanctions · 31 CFR Part 515 (CACR) · OFAC Cuba FAQs · Cuba Restricted List
← Back to map
Energy & power plants · Camagüey

CTE Diez de Octubre (Nuevitas)

Thermoelectric power plant (oil-fired)

🔴 Stateℹ️ Atlas — info only
Scale
~280-375 MW (~125 MW units; sources vary)
Status
Operating but unreliable — a boiler caught fire Dec 2025; multiple unit trips through 2025-2026. Major contributor to the central-Cuba deficit. Opportunity: boiler replacement/modernization.
Sector
Energy & power plants
Province
Camagüey
Coordinates
21.565, -77.272
Layer
Layer 2 · Atlas
Notes
At Punta de Domingo, Nuevitas Bay. Operated by Unión Eléctrica (UNE) under MINEM.
Controlling entity

National electric utility under the Ministry of Energy and Mines. Owns the thermoelectric fleet, the China-backed solar program and wind farms. State-owned and embargo-restricted, though not itself on the CRL/SDN.

Sources: Global Energy Monitor · Unión Eléctrica · CiberCuba · OpenStreetMap